Home / CSI Divisions / Concrete

DIV 03 · STRUCTURE

Concrete Estimating

Formwork, reinforcement, and placement — one of the highest-value divisions to get right, since concrete errors are expensive to fix after the pour.

What We Take Off

  • Footings and foundation walls
  • Slabs-on-grade and elevated slabs
  • Formwork (materials and labor)
  • Reinforcing steel and welded wire mesh
  • Concrete finishing and curing
  • Precast concrete components
2D & 3D Drawing Support

Works from whatever plans you have

Traditional 2D CAD drawings and PDF plan sets, or 3D BIM models — concrete quantities are taken off directly from your source files, cross-checked against the model where one exists, and delivered in the same itemized format either way.

Need the drawings themselves, not just a takeoff from them? See Drawing & Engineering Services.

What We Watch For

Where concrete estimates commonly go wrong

Formwork is priced by contact area, not concrete volume — a common takeoff error is pricing formwork off the same number used for the pour itself, which understates labor on anything with complex geometry.

Get a Quote

Ready for a concrete estimate?

Send your plans and get an itemized, bid-ready estimate back — organized the way you actually bid.

Request a Quote