Home / CSI Divisions / Conveying Equipment

DIV 14 · SPECIALTY

Conveying Equipment Estimating

Vertical and horizontal transportation systems, priced with the long lead times these packages usually carry in mind.

What We Take Off

  • Elevators
  • Escalators and moving walks
  • Dumbwaiters
  • Material handling systems
  • Vehicle and platform lifts
  • Conveying system controls
2D & 3D Drawing Support

Works from whatever plans you have

Traditional 2D CAD drawings and PDF plan sets, or 3D BIM models — conveying equipment quantities are taken off directly from your source files, cross-checked against the model where one exists, and delivered in the same itemized format either way.

Need the drawings themselves, not just a takeoff from them? See Drawing & Engineering Services.

What We Watch For

Where conveying equipment estimates commonly go wrong

Lead times on elevators and escalators can run 20+ weeks — the estimate needs to flag this early, since it affects the schedule as much as the budget.

Get a Quote

Ready for a conveying equipment estimate?

Send your plans and get an itemized, bid-ready estimate back — organized the way you actually bid.

Request a Quote